omniture
from common-pcom:html:key:en_segment_includes_overall_segment_header_shtml
PR Newswire: news distribution, targeting and monitoring
Home Page > News Releases > APAC
en_US ko_KR

Nexans Korea to provide cables for the first petrochemical project of Hyundai Engineering & Construction in Europe

2020-08-24 12:43
  • Scope of supply includes cables of Power, Instrumentation and Telecom
  • Equipped with Nexans innovative Hypron® ecofriendly clean cable technology

SEOUL, South Korea, Aug. 24, 2020 /PRNewswire/ -- Nexans Korea has been awarded a contract from Hyundai Engineering & Construction(HEC) to supply cables of power, instrumentation and telecom for a new petrochemical complex in Poland from 2020 to 2021.

As the first project in Poland, HEC is constructing a new petrochemical complex for PDH Polska S.A, a leading company in chemical industry. With an estimated annual capacity of 437,000 tons of polyprodylene, this new complex will be put into operation in 2023.

Nexans will provide cables with innovative HYPRON® design, which was developed and tested to provide an alternative to lead-sheath cables for onshore oil & gas installations, especially within refineries and petrochemical installations in moist areas where corrosive aromatic hydrocarbons are present. Nexans HYPRON® cables contribute to a green environment by avoiding lead exposure and emissions thanks to three concentric, co-extruded sheaths which provide water tightness as well as resistance to inorganic and organic chemicals.

"We're proud to support HEC's first petrochemical project with our advanced products and solutions,' said Young-Ro RYU, Sales Diector of Nexans Korea, "The agreement we signed with HEC demonstrates our competence in cable technologies and commitment to protect the planet and bring energy to life."

S.Y. Park, Project Director from HEC said, we decided to work with Nexans not only because of their rich experiences in Oil and Gas applications worldwide, but also their ecofriendly clean cable technology. Together, we can power the world in a more sustainable way.

The cables will be produced in Nexans Korea plant and installed within 2022.

For more information, please visit: www.nexans.com  

 

Source: Nexans
Related Links:
from common-pcom:html:key:en_segment_includes_releases_right_column_video_module_shtml

Featured Video

Related Keywords:

Chemical

Oil/Energy

Utilities

Chemical Recent Releases

Oil/Energy Recent Releases

Utilities Recent Releases

from common-pcom:html:key:en_segment_includes_overall_segment_footer_shtml
Advanced Search
Search
  
  1. Products & Services
  2. News Releases
  3. Knowledge Center
  4. Journalists & Media
  5. Multimedia Theater
  6. Contact Us